At the end of September, Sprocket and I arrived at the House Sculpture. It was still early afternoon so I had some daylight to accomplish something. The clearing for the septic still needed finishing before the inspector could come by and look at it, so I started up the tractor and got to work. I called him the next day; I think it was Tuesday. He said he could come by on Thursday evening, so I had a couple of days to turn my attention to the house and it's awkward kitchen. I have noted during several past visits the cramped feeling of the kitchen. Some part needed fixing or "adjustment". The culprit was within the camper section for sure, specifically the spot where the old RV refrigerator was located. I also had decided months before that the entryway was not right. The exterior door must be moved. Really, the whole kitchen needed to be pushed out and that meant more floor which meant more foundation.
Before I began working I did some thinking. I do lot's of standing around thinking. I wanted to picture how the upper floor would relate to the lower. The new section would be squared to the living room section with a second floor deck, I surmised, which will have an entrance from the second floor future master bedroom... and there might be some funky tower in there too. All that will sit upon a garage/ workshop area which will also serve as a seasonal dining room or a place for guests...or something like that...
First I figured out how a wall, square to the box of the house that was the living room, would meet the porch that extended off the kitchen. I then cleared and leveled two spots where two heavy "feet" would need to be located in order to support a load bearing wall that could eventually run flush with the living room. I made the feet with my usual method of placing two 8"X8"X16" cinder blocks together and filling them with concrete. The legs consisted of pressure treated 4"X4" blocks with treated 2"X6"s attached to form "I"s. I bridged them with a thick beam of rough-cut Hemlock. The span had to be rather long, about 8ft.. The floor's close proximity to the Pine tree that will eventually be at the center of the completed house made me want to tread lightly so as not to damage any roots.
When the stringers were in place and anchored to the deck it was time to put the sub floor down. But first I had to cut away another section of the camper (about 44") so that the floor could meet the camper's floor flush and attach securely. I first moved the old RV fridge and propane heater. I began cutting with the Saws-all and Kitty made herself scarce. She always knows when I'm about to make a racket. It's always a messy job removing bits of the camper. Shortly I had yet again cut away a section of my original "house" on this land. Now all that remained was a 6ft. section of what was once the camper's tiny bathroom.
With the removal of that section, the fen Sui immediately improved. Now, in my mind's eye I could see all the kitchen appliances, shelves and cabinets falling easily into their places. It was a stark contrast to my previous mental arrangement of a losing game of Tetris.
At this point in the day, late afternoon Thursday, my time was limited to close up the opening in the wall, but it was also time for the inspector to arrive. And he did just before 6pm.
As before, he had no concerns about my haphazard building style. He took a long look at the clearing I had made and at the plans Ted had drawn up for the septic system. He issued me a permit to continue with my plan, but expressed concerns about my narrow winding driveway. It may have to be widened to get a dump truck up there for the many loads of fill it will take to complete this septic project. But that is for another time, soon to come!